Buyer Guide

Injection Mold Quote Checklist

Send file status, resin target, mold life expectation, cavity assumption and T1 approval criteria so the first quote reflects a real tooling scope instead of a placeholder estimate.

Why this matters

Send file status, resin target, mold life expectation, cavity assumption and T1 approval criteria so the first quote reflects a real tooling scope instead of a placeholder estimate. Injection mold quotes vary widely between suppliers mostly because buyers describe the same part with different assumptions. The fastest route to a comparable price is sending the same file, resin target, cavity expectation and sample criteria to every supplier.

Buyer checks

Send CAD in STEP, X_T or SLDPRT format rather than a photo or sketch whenever the part is past the concept stageState the target resin and any known additive, color or regulatory requirement instead of leaving material selection to the supplierGive an expected annual volume or order size so cavity count and mold life are sized for the real project, not a guessName whether the mold is prototype, bridge, production or export-intended, since that changes steel grade and expected shot countDefine what T1 sample approval will check so correction rounds are scoped before, not after, tooling starts

Quote variables

Quote variableWhy it changes the mold route
File formatA native CAD file lets every supplier measure the same geometry; a photo or sketch produces quotes based on different guesses.
Resin and additiveMaterial grade changes shrinkage, cooling time, steel hardness needs and expected mold life.
Volume expectationAnnual volume or order size is what actually sets cavity count and mold-life target, not the part size alone.
Mold purposePrototype, bridge, production and export molds carry different steel, spare-parts and documentation expectations that change price.

Common mistakes

Requesting a quote from a sketch or reference photo when CAD already exists, which forces suppliers to quote different assumed geometry.Leaving resin and volume unstated, so each supplier default-sizes cavity count and steel grade differently.Comparing a prototype-mold quote against a production-mold quote as if they were the same request.

How to apply it

Send the same CAD file, resin target, volume expectation and T1 approval criteria to every supplier being compared, then treat the quote as directly comparable only if all four match. If the project is early, the guide can show whether the next move is CAD cleanup, DFM review, prototype tooling, production mold planning, export mold handoff or repair review.

Related pages

Upload CADDFM Review